Upload CAD.
Quote in hours.
Parts in days.
For engineers who need parts now, not next month. 4-hour average quote response. CNC in 5 days. 3D printed parts in 3 days. We handle the manufacturing; you focus on the design.
Four steps from CAD to delivery.
Upload CAD
Drag-and-drop STEP file on quote form. Include material, finish, quantity, and any drawings. NDA signed on request before file review.
Receive quote
Engineers review for manufacturability within 4 hours (business hours). Written quote with DFM feedback, pricing by quantity breakpoint, and lead time.
PO & production
Confirm quote with PO or online payment. Material ordered, CAM programmed, production scheduled. Status updates at key milestones.
QC & ship
First-article inspection, final QC, packaging. DHL Priority to 50+ countries. Tracking number and invoice provided. Typical transit 3–5 days USA/EU.
Actual timelines by process.
Honest numbers from our shop floor. Lead times start from PO confirmation and include QC. Rush service available at 1.5–2× cost for critical deadlines.
| Process | Standard | Rush (1.5–2× cost) | Notes |
|---|---|---|---|
| CNC machining (simple) | 3–5 days | 2 days | Aluminum, brass, steel — common materials in stock |
| CNC machining (complex) | 7–10 days | 4–5 days | 5-axis, tight tolerances, specialty materials |
| SLA 3D printing | 2–3 days | Same day | Standard resins — functional prototypes |
| SLS 3D printing | 3–5 days | 48 hours | Nylon PA12, PA12-GF — production-quality prototypes |
| MJF 3D printing | 3–5 days | 48 hours | HP Multi Jet Fusion — best mechanical 3D print option |
| Sheet metal | 5–10 days | 3–5 days | Laser cut + bend, aluminum and steel |
| Injection molding (soft tool) | 14–21 days | 10–14 days | Aluminum rapid tooling + production-material parts |
| Vacuum casting | 7–10 days | 5–7 days | Silicone mold + 20–50 PU copies |
| Finishing (anodize, paint) | +3–5 days | +2 days | Added to base production lead time |